Use Cases 4: Large Port

Use Cases 4: Large Port

https://www.esix.co/en/solutions/use-cases/large-port

Challenge:

Every second worth a lot

Most of the Large port is using physical fibre for their day to day operation, however due to continues uses, the fibre is easy to break and their operation stops.

Solutions:

No interruption of service

Smart LTE / 5G remote control solutions deployment is easy and time saving, the installation only takes 2-3 days rather than a few months, no physical damage to avoid any interruption in operation.

Other Use Case